Our Execution Projects
Explore a selection of our execution projects
M3 Toulouse - Station Raynal
The Raynal station represents a gateway to the new central area of Toulouse developed around the Toulouse Euro Southwest project. In 2024, this station will combine a connection to the new economic hub of the metropolis and support for the North districts, destined to develop significantly.
We are collaborating with Demathieu et Bard to carry out the execution study of the structure.
Key project information:
Project Owner: Tisséo Ingénierie
Project Management: Systra
Contractor: Demathieu et Bard
CEM Palaiseau SMI
The operations center in Palaiseau, located in the Croix de Villebois sector north of École Polytechnique, will serve as the maintenance and storage site for passenger rolling stock and the centralized command post for the future Line 18. To head east, the trains will use a branching track, via the Camille Claudel structures.
We collaborated with Chantiers Modernes Construction to carry out the execution study for the CEM Pal SMI structure.
Key project information:
Project Owner: Société du Grand Paris
Project Management Group: Groupement ICARE
Contractor: Chantiers Modernes Construction
Porte Maillot - EOLE - RER E
With the new 8 km tunnel infrastructure between Haussmann Saint-Lazare and Nanterre, 3 new stations are being created, including the Porte Maillot station. Located under the current Porte Maillot roundabout and designed by architect JM Duthilleul, this station will be the iconic symbol of the underground stations of the new Line E of the RER.
We collaborated with Bouygues Construction to carry out the execution study for the Hall Parvis - Porte Maillot structure.
Key project information:
Project Owner: Société du Grand Paris
Project Management: Egis
Contractor: Bouygues Construction
Syctom Saint-Ouen
Architectural and landscape requalification of the Syctom waste treatment plant for its urban integration into the new district of ZAC des Docks.
As a witness to the industrial history of Saint-Ouen-sur-Seine, Syctom remains the major incineration center in the northern Île-de-France.
We collaborated with the NGE GC/Urbaine de Travaux Fayat consortium to carry out the execution study for the 3 structures FS1, FS2, and FS3.
Key Project Details:
Project Owner: SYCTOM
Contractor: Consortium NGE GC / Urbaine de Travaux Fayat
Project Management: ARTELIA
L15 T2A Gare Créteil L’Echat
As part of the Grand Paris Express, the largest urban project currently underway in Europe, Lot T2A of Line 15 South includes the section between Villejuif Louis-Aragon station (excluding the station) and Créteil l'Echat.
We collaborated with the Horizon consortium, led by Bouygues Travaux Publics, to carry out the execution study for the Créteil l'Echat station.
Key project information:
Project Owner: Société du Grand Paris
Project Management: Systra
Contractor: Bouygues Travaux Publics
L15 T3B Gare FIVC
As part of the Grand Paris Express, integrated into Line 15 South (as Lot T3B), the Fort d’Issy-Vanves-Clamart (FIVC) station is a complex structure, part of which was designed under the tracks of the N line of the Transilien, connecting Paris-Montparnasse to the western suburbs, while still in operation.
We collaborated with Bouygues Travaux Publics to carry out the execution study for the FIVC station.
Key Project Details:
Project Owner: Société du Grand Paris
Project Management: Systra
Contractor: Bouygues Travaux Publics